RAMS for System Scaffold UK — Free 5-Min Builder | Riskora

RAMS for Layher, HAKI, Cuplok system scaffold erection. Professional format for site submission. Try Riskora free.

Frequently asked questions

How does SG4:22 change what my scaffold RAMS has to say?
SG4:22 requires collective fall protection at every working lift, which means advance guard rail (AGR) discipline during both erect and dismantle — operatives must not step onto a lift until the guard rail is in place above them. The RAMS has to name AGR as the primary control, not harness restraint. Harness is mitigation and only acceptable where collective protection is genuinely not reasonably practicable, and the justification must be documented.
Do I need a bespoke design for Layher/HAKI/Cuplok or is TG20:21 enough?
TG20:21 compliance sheets cover most standard tube-and-fitting configurations up to 50 m high with standard tie patterns and live load class. Anything outside the compliance envelope — heavy duty above 2.0 kN/m², cantilever, bridged, complex sheeting/netting wind loads, or non-standard system components — needs a bespoke design from a competent designer (typically a Chartered TWC), with the design number cross-referenced on the RAMS cover sheet.
Is the output accepted by principal contractors?
Yes. Riskora generates professional documents in the standard UK format with risk matrices, control measures, and method statements that principal contractors expect.
Can I edit the document after generating it?
Yes. Every section is editable. Add, remove, or modify hazards, controls, and method steps to match your specific site conditions.