Skip to content
Your first safety document is free.No card required

Free UK RAMS template and builder

Your RAMS template.
Your job details.
Ready in minutes.

Start with the blank RAMS PDF or describe your job and let Riskora structure the document. Create a risk assessment and method statement together, ready to review, edit and share.

  • Free to start
  • Preview before sign-up
  • PDF download
See a real Riskora document Download the blank RAMS PDF

Preview before signup. Your first lifetime safety document is free. No card required.

YOUR FIRST DOCUMENT, FREE

Build your RAMS around the job

Give a short scope and the site details that affect the work.

UK RAMS

Up to 200 characters. Summarise your job; refine the assessment and method in the builder.

This is the title that appears on your document.

Generate a preview first. Sign up only when you want to save, edit or export.

No card required 1 lifetime safety document

REAL DOCUMENT. REAL DETAIL.

See the difference yourself.

Explore a real Riskora safety document and see the structure, depth and professional finish for yourself.

Example Riskora document · UK RAMS

Try the new compact mode. Same document, just more compact

Full version

UK (RAMS) example document — Two-Storey Rear Extension — 14 Birchwood Lane, Reading. Client: Mr & Mrs A. Whitfield (Private Client). Site: 14 Birchwood Lane, Reading, RG1 5JT. Scope: Construction of a two-storey rear extension (6.4m × 4.2m) to an existing semi-detached dwelling. Works comprise breaking out of existing rear elevation, trench-fill foundations to 1.0m, traditional cavity blockwork to first floor, pre-stressed concrete lintels, timber roof structure with natural slate finish, plus alterations to existing rear wall to form structural opening with rolled steel joist (RSJ 203×102 UB23). Works programmed over 9 weeks with a peak site team of 6 operatives. Hazards assessed: Manual handling — blocks, lintels, plasterboard, Working at height — independent scaffold & roof structure, Buried services strike during excavation, Collapse of excavation / trench wall, Hand-arm vibration (HAVS) — breaking out, drilling, Silica dust — cutting blocks, brick, concrete, Vehicle/pedestrian segregation — narrow domestic street.

Example UK (RAMS) front cover produced by Riskora

This is the real UK construction RAMS from our homepage, with the risk assessment and method statement together. Explore the Full or Compact presentation to see a completed document before building your own.

FROM DETAILS TO DOCUMENT

Your first document. Three simple steps.

Start with the details you know. See your document before you sign up.

  1. 01

    Choose your starting point

    Download the blank RAMS PDF if you want to prepare the record yourself, or enter a concise job brief to have Riskora structure a document around your work.

  2. 02

    Make it specific

    Check the hazards, controls and method against the site. Add the responsible people and practical arrangements, remove irrelevant content and resolve any assumptions before the document is issued.

  3. 03

    Review and download

    Preview your generated document, then sign up free to save, edit and download your first PDF. Complete the necessary competent review and brief the team before using it.

Build my RAMS free

No card required · Your first safety document is free

From template headings to a useful record

What to put in your RAMS

A RAMS template gives you a structure. The value comes from describing the actual work and making the assessment, controls and working sequence consistent.

HSE — Risk assessment templates and examples
01

Project details and scope

Identify the site, activity, limits and people involved. Choose a title that distinguishes this package, with document details that show the reviewer what is covered and which version they are reading.

02

Hazards and people affected

Describe hazards arising from the task and its setting, including risks to people beyond your own crew. Keep each entry relevant to something the team needs to manage on this job.

03

Controls and further actions

Distinguish agreed precautions from outstanding actions. Check that controls are available and suitable for the site, and make responsibility and timing clear for anything that still needs to be arranged.

04

The working method

Explain setup, the main activity and handover in a clear sequence, linking stages to the relevant precautions. Include dependencies and review points that affect how the team will carry out the job.

05

Resources and site arrangements

Record plant, tools, access, materials and PPE, with the arrangements needed to use them. Identify supporting information or permissions, and keep the resource list consistent with the working method.

06

Emergency details and review

Check local contacts and emergency arrangements, then identify who will review and communicate the document. Keep the issued record current when the scope or conditions change so the team uses the agreed method.

A blank template or a document built for you

Use the template in the way that suits your job

If you already know what you need to write, the blank RAMS PDF provides a starting structure. If the paperwork is holding up a client submission, the builder can produce a structured document from a short brief in minutes. You can inspect a real completed example on this page before deciding how to start.

Whichever route you choose, review the content for the actual task. A previous job’s controls, access arrangements or emergency contacts may not apply to the next site. Keep the risk assessment and method statement aligned so the precautions listed in one are reflected in the working sequence described in the other.

  • Start with the real scope, location and people involved rather than changing the name on an old document.
  • Confirm the client’s submission requirements and any site arrangements your method depends on.
  • Remove irrelevant template content and explain the controls that the team can actually put into practice.
  • Review the completed assessment and method together, then communicate the agreed version to the people doing the work.
Download the blank RAMS PDF
Your first safety document, free

Start your RAMS free.

Generate a preview first. Sign up only when you want to save, edit or export.

Final RAMS must be reviewed and approved by a competent person before use.

A FEW THINGS, ANSWERED

RAMS template questions.

Practical answers before you start your first document.

Can I download a blank RAMS template?

Yes. Use “Download the blank RAMS PDF” on this page for the existing UK template. It gives you a starting structure to complete for your work. The generated-document option is separate: describe your job, review the preview and create a free account to save, edit and download your first document.

What is the difference between a template and generated RAMS?

The blank template provides headings for you to complete. The Riskora builder structures content around the job details you provide, giving you an assessment and method to review and refine. Both routes require you to confirm the site information and the practical precautions before use.

Can I use the example as RAMS for my own job?

Use it to understand the presentation and structure, not as a substitute for assessing your work. HSE advises against copying an example and simply changing the company name. Your hazards, people, controls and working arrangements must reflect your own site and task.

HSE — Risk assessment templates and examples
Is there one mandatory RAMS template for every UK job?

There is no single universal RAMS layout that establishes compliance for every activity. The required assessment and arrangements depend on the work and applicable duties, and clients may specify their own submission format. The important step is to check that the record adequately describes your job and its precautions.

HSE — Construction risk assessments and method statements
Can I change the generated document before downloading?

Yes. Sign up free to save and edit the document, then download the PDF. Check the scope, hazard entries, controls, method and local arrangements together. If a reviewer asks for changes, update the relevant content so the finished document remains consistent from the assessment through to the method.

How does the first-document-free offer work?

Preview before signup, with no card required. A free account includes one lifetime safety document with a PDF download, shared across safety document types. Current paid options are available on the pricing page when you need more documents.

Guidance for preparing your document

Check the relevant guidance alongside the conditions, people and work at your site.