By the Riskora Editorial Team · Reviewed against our editorial standards · Last reviewed
Pitched-roof RAMS that pass principal-contractor review: edge protection under WAH 2005, fragile-surface controls per HSG33, manual handling of slate and tile, RCS silica from cutting, and wind / weather hold-points. Generate a site-ready document in under five minutes.
UK (RAMS) example document — Two-Storey Rear Extension — 14 Birchwood Lane, Reading. Client: Mr & Mrs A. Whitfield (Private Client). Site: 14 Birchwood Lane, Reading, RG1 5JT. Scope: Construction of a two-storey rear extension (6.4m × 4.2m) to an existing semi-detached dwelling. Works comprise breaking out of existing rear elevation, trench-fill foundations to 1.0m, traditional cavity blockwork to first floor, pre-stressed concrete lintels, timber roof structure with natural slate finish, plus alterations to existing rear wall to form structural opening with rolled steel joist (RSJ 203×102 UB23). Works programmed over 9 weeks with a peak site team of 6 operatives. Hazards assessed: Manual handling — blocks, lintels, plasterboard, Working at height — independent scaffold & roof structure, Buried services strike during excavation, Collapse of excavation / trench wall, Hand-arm vibration (HAVS) — breaking out, drilling, Silica dust — cutting blocks, brick, concrete, Vehicle/pedestrian segregation — narrow domestic street.

Full version
Takes less than 5 minutes
No card required · 1 free PDF · Upgrade any time (completely free)
Roofing submissions fail when fragile rooflights aren't identified before access, when edge protection is described in prose but not specified to a TG20:21 / NASC standard, and when crawl boards or man-safe lines aren't tied to a written rescue plan. Roof RAMS also have to cover battening dust, respirable crystalline silica from slate or tile cutting, and weather hold-points (wind, ice, lightning) — none of which appear in a generic "working at height" template.
Falls from height remain the leading cause of fatal injuries in UK construction. Roof work is particularly high-risk due to fragile surfaces, edge exposure, and weather conditions.
Riskora pre-loads the roofing hazard register HSE Construction Division actually queries — fragile surfaces, edge falls, manual handling above 25 kg, HAVS and silica from cutting, lightning / wind hold-points — each cross-referenced to WAH 2005, HSG33 and CAR 2012 where slate dust applies. Pick re-roof, repair or new-build pitched, add ridge length and pitch, download. For complex packages you can also pair this with a standalone risk assessment or method statement.
Before you generate your document, these guides cover the knowledge that underpins every good RAMS, risk assessment, and method statement.
What Is a RAMS Document?
Understand the two components of a RAMS and why they're required before work begins on site.
How to Write a RAMS Document
A step-by-step guide to structuring your RAMS from project details through to sign-off.
UK Legal Requirements for Risk Assessments
What the law requires under MHSWR 1999 and CDM 2015, and what 'suitable and sufficient' means.
Who Needs a RAMS?
Find out whether your work requires a RAMS and who is responsible for producing one.
RAMS vs Risk Assessment — Key Differences
When you need a full RAMS versus a standalone risk assessment, and how the two documents work together.
How to Write a RAMS (UK Guide)
A practical walkthrough of writing RAMS from scratch, covering structure, common mistakes, and what reviewers look for.
Pitched re-cover, strip-and-relay and patch repairs each carry different residual risks even when the headline hazards (eaves fall, fragile cover) are the same. The register below is the minimum set reviewers expect on a slate/tile RAMS submission.
| Hazard | Who is at risk | Primary control | Regulation reference |
|---|---|---|---|
| Fall from eaves / verge / ridge | Roofer, labourer | Independent scaffold with double guard rail + toeboard at eaves; ridge anchor with twin lanyard for short-duration ridge work | WAH 2005 reg 6 + Sch 2 |
| Fall through fragile underlay / rooflight | Roofer | Crawl boards + roof ladders; cover or fence rooflights before strip; HSE INDG284 inspection | WAH 2005 reg 9 |
| Falling tiles / slates / battens | Operatives below, public | Debris netting on scaffold; chute to skip; exclusion zone with banksman | CDM 2015 reg 13 |
| Manual handling — slate bundle (~25 kg) lifted to ridge | Roofer | Tile hoist / scaffold lift; bundle splitting at ground level; team lift above 25 kg | MHO 1992 reg 4 |
| Asbestos cement underlay / soffit (pre-2000) | All site personnel | Refurbishment & demolition survey before strip; licensed removal where required; HSG264 | CAR 2012 |
| Hot works — lead burning, torch-on felt at flashings | Roofer, structure | Hot works permit; fire watch 60 min after work; extinguisher within 3 m | RRO 2005 + DSEAR 2002 |
| Adverse weather — wind > 23 mph at eaves | Roofer | Daily forecast briefing; stop work threshold per NFRC TS18; secure loose materials | WAH 2005 reg 4 |
Sequence Riskora generates for a typical strip-and-relay on a domestic pitched roof, with edge protection from an independent scaffold. Each step links to a controlled hazard in the register above.
Will this take long?
Under 5 minutes. Select your trade, pick hazards, download.
Is it complicated?
No training needed. The guided builder walks you through every step.
Do I need experience?
If you know what work you're doing, you can use Riskora.
Is it free to try?
Yes. The Free plan needs no card — generate, review and download one free PDF. Upgrade any time for branding, DOCX, sign-off and higher limits.
Create your RAMS in under 5 minutes
No onboarding or setup needed — start generating documents instantly
Try Riskora FreeNo card required · 1 free PDF · Upgrade any time (completely free)
All documents generated by Riskora should be reviewed by a competent person before use on site. Riskora provides structured templates — professional judgement is always required.
Riskora builds a structured, client-facing document — not a generic AI paragraph. Every section is shaped around your job, your site and your team.
Task-specific hazards for the job, captured row by row — not a generic list pulled from an old RAMS.
Control measures mapped to each hazard with residual risk scoring after controls are applied.
PPE requirements tied to the activity and site, ready to brief to the team.
Step-by-step method statement structured around how the work is actually sequenced on site.
First aid, rescue plan, emergency contacts and site-specific escalation routes.
Substance prompts when the work involves chemicals, dusts, fumes or sealants — flagged early, not missed at review.
Operative sign-off captured against the document — names, dates and acknowledgement of the brief.
Every change tracked so you can show what was issued, when, and which version the team signed.
Clear approval state on every document — draft, in review, approved, issued — visible across the team.
Who created it, who reviewed it, who signed it. A complete trail you can hand to a principal contractor or auditor.
The reason RAMS get rejected is rarely the format — it's that the document is obviously generic. Riskora rebuilds it around this job, this site and this task.
Generic template copied from an old job.
Site-specific document structured around this job, site and task.
A four-step workflow used by contractors, consultants and safety teams to turn informal job details into client-ready safety paperwork.
Drop in a client email, a WhatsApp from the site manager, a scope of works or a tender note. Anything that describes the job.
Riskora turns your brief into hazards, controls, method steps, PPE, emergency arrangements and COSHH prompts.
You stay in control of every section. Tweak anything, then download a clean PDF or share a link.
Brief operatives, capture their sign-off and keep a full audit trail of who signed which version.
Riskora is built by a founder with hands-on site and document experience — designed for contractors, consultants and safety teams who need to issue, brief and prove safety paperwork without losing a day to admin.
No training. No complex setup. Just select your trade and go.
Start Your RAMS Now — It's FreeNo card required · 1 free PDF · Upgrade for branding, DOCX, sign-off and audit trails (completely free)
Primary UK sources covering the legal and practical framework behind RAMS, risk assessments and method statements.
Generate a preview first. Sign up only when you want to save, edit or export.
Final RAMS must be reviewed and approved by a competent person before use.
Riskora is an assistive document preparation tool. All documents generated must be reviewed, verified, and approved by a competent person before use on site. Riskora does not replace professional safety judgment, and no output should be treated as a legal compliance guarantee.