Painting RAMS that survive principal-contractor review: lead-paint disturbance under CLAW 2002, isocyanate and solvent spray under COSHH reg 11, MEWP / tower / podium access under WAH 2005, and DSEAR exclusion zones during atomised spray. Generate a site-ready document in under five minutes.
UK (RAMS) example document — Two-Storey Rear Extension — 14 Birchwood Lane, Reading. Client: Mr & Mrs A. Whitfield (Private Client). Site: 14 Birchwood Lane, Reading, RG1 5JT. Scope: Construction of a two-storey rear extension (6.4m × 4.2m) to an existing semi-detached dwelling. Works comprise breaking out of existing rear elevation, trench-fill foundations to 1.0m, traditional cavity blockwork to first floor, pre-stressed concrete lintels, timber roof structure with natural slate finish, plus alterations to existing rear wall to form structural opening with rolled steel joist (RSJ 203×102 UB23). Works programmed over 9 weeks with a peak site team of 6 operatives. Hazards assessed: Manual handling — blocks, lintels, plasterboard, Working at height — independent scaffold & roof structure, Buried services strike during excavation, Collapse of excavation / trench wall, Hand-arm vibration (HAVS) — breaking out, drilling, Silica dust — cutting blocks, brick, concrete, Vehicle/pedestrian segregation — narrow domestic street.

Full version
Takes less than 5 minutes
No card required · 1 free PDF · Upgrade any time (completely free)
Painting submissions are returned at pre-start for predictable reasons: no XRF or swab test recorded on pre-1960 substrate, COSHH assessments copied from the wrong SDS, spray exclusion zones missing from the method, and a single "fall from height" line where a podium → tower → MEWP hierarchy belongs. Generic Word templates can't carry the regulation references — CLAW 2002, COSHH reg 11, EH40/2005 WELs, WAH 2005 — that a CDM principal contractor expects to see cross-referenced inside the document, not just listed on the cover.
HSE statistics consistently show construction as the sector with the highest number of workplace fatalities in the UK.
Riskora pre-loads the painting-specific hazard register — lead, solvents, 2-pack isocyanates, dermatitis, DSEAR ignition during spray, falls from tower or MEWP — each mapped to the correct UK regulation with the right control hierarchy already in place. Pick interior repaint, external decoration or spray-applied protective coating, add the address and substrate age, and download. If you're new to the format, our step-by-step guide to writing a RAMS explains the structure before you generate.
Before you generate your document, these guides cover the knowledge that underpins every good RAMS, risk assessment, and method statement.
What Is a RAMS Document?
Understand the two components of a RAMS and why they're required before work begins on site.
How to Write a RAMS Document
A step-by-step guide to structuring your RAMS from project details through to sign-off.
UK Legal Requirements for Risk Assessments
What the law requires under MHSWR 1999 and CDM 2015, and what 'suitable and sufficient' means.
Who Needs a RAMS?
Find out whether your work requires a RAMS and who is responsible for producing one.
How to Write a RAMS (UK Guide)
A practical walkthrough of writing RAMS from scratch, covering structure, common mistakes, and what reviewers look for.
RAMS vs Risk Assessment — Key Differences
When you need a full RAMS versus a standalone risk assessment, and how the two documents work together.
Below are the hazards principal contractors most commonly query on painting RAMS submissions. Pre-1960s repaint, spray application and any work above 2 m should always appear on the register — omission is the single biggest reason painting RAMS are rejected on first review.
| Hazard | Who is at risk | Primary control | Regulation reference |
|---|---|---|---|
| Lead in paint (pre-1960s substrate) | Operative, occupants, cleaners | XRF/swab test before disturbance; wet sanding + HEPA H-class vac; FFP3 RPE | CLAW 2002 |
| Solvent vapour (oil-based undercoat, MEK cleaners) | Operative, adjacent trades | Substitute to water-based where specified; mechanical ventilation; A2/P3 RPE for sustained spray | COSHH 2002 reg 7 |
| Isocyanate exposure (2-pack PU on metalwork) | Sprayer, prep operative | Booth or enclosure with LEV; air-fed visor; health surveillance (HSG283) | COSHH 2002 reg 11 |
| Fall from MEWP/podium/tower (eaves, stairwell, soffit) | Operative | PASMA-erected tower or IPAF MEWP; harness + 1.75 m lanyard in boom; rescue plan on board | WAH 2005 reg 6 |
| Dermatitis from prolonged solvent/epoxy contact | Operative | Nitrile gloves changed per shift; pre/post barrier cream; skin checks recorded | COSHH 2002 + HSG262 |
| Slips on overspray / spilled paint | All site personnel | Floor protection (correx + tape); spill kit at point of use; exclusion barriers during spray | WHSWR 1992 reg 12 |
| Fire/explosion (solvent storage, spray atomisation) | All site personnel | Max 50 L solvent in workshop; bonded steel cabinet; hot works embargo within 3 m during spray | DSEAR 2002 |
The following is the structured task sequence Riskora generates for a typical interior repaint / spray-applied protective coating job. Each numbered step maps to a controlled hazard in the register above.
Will this take long?
Under 5 minutes. Select your trade, pick hazards, download.
Is it complicated?
No training needed. The guided builder walks you through every step.
Do I need experience?
If you know what work you're doing, you can use Riskora.
Is it free to try?
Yes. The Free plan needs no card — generate, review and download one free PDF. Upgrade any time for branding, DOCX, sign-off and higher limits.
Create your RAMS in under 5 minutes
No onboarding or setup needed — start generating documents instantly
Try Riskora FreeNo card required · 1 free PDF · Upgrade any time (completely free)
All documents generated by Riskora should be reviewed by a competent person before use on site. Riskora provides structured templates — professional judgement is always required.
Riskora builds a structured, client-facing document — not a generic AI paragraph. Every section is shaped around your job, your site and your team.
Task-specific hazards for the job, captured row by row — not a generic list pulled from an old RAMS.
Control measures mapped to each hazard with residual risk scoring after controls are applied.
PPE requirements tied to the activity and site, ready to brief to the team.
Step-by-step method statement structured around how the work is actually sequenced on site.
First aid, rescue plan, emergency contacts and site-specific escalation routes.
Substance prompts when the work involves chemicals, dusts, fumes or sealants — flagged early, not missed at review.
Operative sign-off captured against the document — names, dates and acknowledgement of the brief.
Every change tracked so you can show what was issued, when, and which version the team signed.
Clear approval state on every document — draft, in review, approved, issued — visible across the team.
Who created it, who reviewed it, who signed it. A complete trail you can hand to a principal contractor or auditor.
The reason RAMS get rejected is rarely the format — it's that the document is obviously generic. Riskora rebuilds it around this job, this site and this task.
Generic template copied from an old job.
Site-specific document structured around this job, site and task.
A four-step workflow used by contractors, consultants and safety teams to turn informal job details into client-ready safety paperwork.
Drop in a client email, a WhatsApp from the site manager, a scope of works or a tender note. Anything that describes the job.
Riskora turns your brief into hazards, controls, method steps, PPE, emergency arrangements and COSHH prompts.
You stay in control of every section. Tweak anything, then download a clean PDF or share a link.
Brief operatives, capture their sign-off and keep a full audit trail of who signed which version.
Riskora is built by a founder with hands-on site and document experience — designed for contractors, consultants and safety teams who need to issue, brief and prove safety paperwork without losing a day to admin.
No training. No complex setup. Just select your trade and go.
Start Your RAMS Now — It's FreeNo card required · 1 free PDF · Upgrade for branding, DOCX, sign-off and audit trails (completely free)
Primary UK sources covering the legal and practical framework behind RAMS, risk assessments and method statements.
Generate a preview first. Sign up only when you want to save, edit or export.
Final RAMS must be reviewed and approved by a competent person before use.
Riskora is an assistive document preparation tool. All documents generated must be reviewed, verified, and approved by a competent person before use on site. Riskora does not replace professional safety judgment, and no output should be treated as a legal compliance guarantee.