HVAC install RAMS that pass M&E coordinator review: F-Gas refrigerant handling, pressure-system commissioning under PSSR 2000, ductwork lifts at height, brazing hot works and Legionella controls on chilled-water systems. Generate a site-ready document in under five minutes.
UK (RAMS) example document — Two-Storey Rear Extension — 14 Birchwood Lane, Reading. Client: Mr & Mrs A. Whitfield (Private Client). Site: 14 Birchwood Lane, Reading, RG1 5JT. Scope: Construction of a two-storey rear extension (6.4m × 4.2m) to an existing semi-detached dwelling. Works comprise breaking out of existing rear elevation, trench-fill foundations to 1.0m, traditional cavity blockwork to first floor, pre-stressed concrete lintels, timber roof structure with natural slate finish, plus alterations to existing rear wall to form structural opening with rolled steel joist (RSJ 203×102 UB23). Works programmed over 9 weeks with a peak site team of 6 operatives. Hazards assessed: Manual handling — blocks, lintels, plasterboard, Working at height — independent scaffold & roof structure, Buried services strike during excavation, Collapse of excavation / trench wall, Hand-arm vibration (HAVS) — breaking out, drilling, Silica dust — cutting blocks, brick, concrete, Vehicle/pedestrian segregation — narrow domestic street.

Full version
Takes less than 5 minutes
No card required · 1 free PDF · Upgrade any time (completely free)
HVAC submissions get returned when F-Gas Cat 1 certification isn't named against the operative, when the nitrogen-purge / pressure-test sequence is missing from the method, and when ductwork lifts above 2 m default to "use harness" instead of a podium → scissor-lift → MEWP hierarchy. Plant-room work also brings confined-space, asphyxiation and L8 Legionella considerations that a generic plumbing template never carries — and which a competent M&E reviewer will pick up immediately.
Plumbing and heating work involves hot work, chemical exposure, and water hygiene risks that require trade-specific documentation.
Riskora pre-loads the HVAC hazard register — refrigerant exposure, brazing hot works, plant-room asphyxiation, chilled-water Legionella, ductwork drops, brazing-fume RCS — each mapped to the F-Gas Regs (EU 517/2014), PSSR 2000, COSHH 2002 and L8 ACoP. Pick split-system, VRF/VRV, AHU or ductwork install, add the building and floor level, download. If you're new to RAMS structure, see our step-by-step guide to writing a RAMS.
Before you generate your document, these guides cover the knowledge that underpins every good RAMS, risk assessment, and method statement.
What Is a RAMS Document?
Understand the two components of a RAMS and why they're required before work begins on site.
How to Write a RAMS Document
A step-by-step guide to structuring your RAMS from project details through to sign-off.
UK Legal Requirements for Risk Assessments
What the law requires under MHSWR 1999 and CDM 2015, and what 'suitable and sufficient' means.
Who Needs a RAMS?
Find out whether your work requires a RAMS and who is responsible for producing one.
RAMS vs Risk Assessment — Key Differences
When you need a full RAMS versus a standalone risk assessment, and how the two documents work together.
How to Write a RAMS (UK Guide)
A practical walkthrough of writing RAMS from scratch, covering structure, common mistakes, and what reviewers look for.
HVAC RAMS are routinely rejected when they treat the work as "M&E" instead of separating refrigerant, hot-works and pressure-system hazards. The register below covers a typical VRF/AHU installation with ductwork at high level.
| Hazard | Who is at risk | Primary control | Regulation reference |
|---|---|---|---|
| Refrigerant release (R32, R454B — A2L mildly flammable) | Engineer, occupants | Charge calc vs room volume (EN 378); leak test before commissioning; no ignition sources during brazing/charging | F-Gas Reg (EU) 517/2014 + DSEAR 2002 |
| Hot works — brazing copper, soft-soldering | Engineer, building fabric | Hot works permit; nitrogen purge during braze; fire watch 60 min post-work; CO₂ extinguisher within 3 m | RRO 2005 + HSG139 |
| Pressure testing — N₂ at up to 41 bar (high-side R32) | Engineer, adjacent trades | Calibrated regulator + PRV; signage; written system pressure test (WSPT) procedure; competent person sign-off | PSSR 2000 reg 8 |
| Work at height — ductwork > 2 m, MEWP for indoor unit hoist | Engineer, mate | IPAF-operated scissor lift on level surface; harness in boom; podium for sub-2 m fixings | WAH 2005 reg 6 |
| Electrical — 230/400 V termination at outdoor unit | Engineer | Safe Isolation per HSG85; lock-off; proven dead with GS38 voltage indicator; EICR record | EAW 1989 reg 14 |
| Manual handling — AHU sections, FCU lifts in ceiling void | Engineer, mate | Mechanical lift for > 25 kg; two-person handle in restricted ceiling void; pre-task MAC score | MHO 1992 reg 4 |
| Asphyxiation — refrigerant accumulation in plant room or ceiling void | Anyone in space | Refrigerant detector + alarm to BS EN 378-3; mechanical ventilation interlock; no entry alone | CSWR 1997 + COSHH 2002 |
Sequence Riskora generates for a typical VRF system with high-level ductwork. Permits, isolations and competencies are called out where the regulation requires it.
Will this take long?
Under 5 minutes. Select your trade, pick hazards, download.
Is it complicated?
No training needed. The guided builder walks you through every step.
Do I need experience?
If you know what work you're doing, you can use Riskora.
Is it free to try?
Yes. The Free plan needs no card — generate, review and download one free PDF. Upgrade any time for branding, DOCX, sign-off and higher limits.
Create your RAMS in under 5 minutes
No onboarding or setup needed — start generating documents instantly
Try Riskora FreeNo card required · 1 free PDF · Upgrade any time (completely free)
All documents generated by Riskora should be reviewed by a competent person before use on site. Riskora provides structured templates — professional judgement is always required.
Riskora builds a structured, client-facing document — not a generic AI paragraph. Every section is shaped around your job, your site and your team.
Task-specific hazards for the job, captured row by row — not a generic list pulled from an old RAMS.
Control measures mapped to each hazard with residual risk scoring after controls are applied.
PPE requirements tied to the activity and site, ready to brief to the team.
Step-by-step method statement structured around how the work is actually sequenced on site.
First aid, rescue plan, emergency contacts and site-specific escalation routes.
Substance prompts when the work involves chemicals, dusts, fumes or sealants — flagged early, not missed at review.
Operative sign-off captured against the document — names, dates and acknowledgement of the brief.
Every change tracked so you can show what was issued, when, and which version the team signed.
Clear approval state on every document — draft, in review, approved, issued — visible across the team.
Who created it, who reviewed it, who signed it. A complete trail you can hand to a principal contractor or auditor.
The reason RAMS get rejected is rarely the format — it's that the document is obviously generic. Riskora rebuilds it around this job, this site and this task.
Generic template copied from an old job.
Site-specific document structured around this job, site and task.
A four-step workflow used by contractors, consultants and safety teams to turn informal job details into client-ready safety paperwork.
Drop in a client email, a WhatsApp from the site manager, a scope of works or a tender note. Anything that describes the job.
Riskora turns your brief into hazards, controls, method steps, PPE, emergency arrangements and COSHH prompts.
You stay in control of every section. Tweak anything, then download a clean PDF or share a link.
Brief operatives, capture their sign-off and keep a full audit trail of who signed which version.
Riskora is built by a founder with hands-on site and document experience — designed for contractors, consultants and safety teams who need to issue, brief and prove safety paperwork without losing a day to admin.
No training. No complex setup. Just select your trade and go.
Start Your RAMS Now — It's FreeNo card required · 1 free PDF · Upgrade for branding, DOCX, sign-off and audit trails (completely free)
Primary UK sources covering the legal and practical framework behind RAMS, risk assessments and method statements.
Generate a preview first. Sign up only when you want to save, edit or export.
Final RAMS must be reviewed and approved by a competent person before use.
Riskora is an assistive document preparation tool. All documents generated must be reviewed, verified, and approved by a competent person before use on site. Riskora does not replace professional safety judgment, and no output should be treated as a legal compliance guarantee.